Real industrial projects, with measurable results.
Projects delivered for clients in manufacturing, energy, metalworking and recycling. Turnkey equipment commissioned, tested and supported by the UZINEX team.

A new revenue line in CDW recycling with a Barford 750J crusher, in 50 days
A construction company founded in 1991 opened a vertical construction-waste recycling line. UZINEX delivered the Barford 750J RS mobile jaw crusher via VAT-free intra-community acquisition, from the manufacturer's stock, in 50 days (vs 6–9 months). 40–80 t/h, 0–63 mm output. The project made UZINEX Barford's official distributor in Romania.
Read the case study →
11 machines, 2 flown in by air so the AFIR funding wouldn't be lost
A firefighter opened a B2B white-label knitwear factory with over €100,000 in AFIR funding and a hard deadline. We were the only supplier willing to fly in 2 knitting machines of 1.5 tonnes each as air cargo, in 5 days. A rare configuration in Romania: 5G + 10G at a 2.5-metre working width.
Read the case study →
A strategic pivot to the clean-sheet niche with a 6 kW fiber laser
Marian sold gates and railings directly to end clients, but his old machines couldn't deliver a clean edge. A Start-Up Nation 2022 investment brought a 6 kW fiber laser, laser welding and a digitalization package. For B2C clients, the clean laser edge is the immediately visible selling point.
Read the case study →
A geologist's 19-year dream, fulfilled with ×2.74 growth in two years
A geological engineer opened his quarry in 2005 to sell ornamental limestone, but the market wasn't ready — he sold crushed stone for 19 years. In 2022 UZINEX delivered a pilot boulder-cutting machine plus a 3-axis CNC with a 7 kW spindle. Turnover grew from 2.13M to 5.83M lei in two years, all from own funds.
Read the case study →
The craftsman, his back pain, and a workshop producing 5–6× faster
A wrought-iron craftsman with chronic back pain moved from manual machines to a €68,000 semi-automatic workshop (Start-Up Nation funding, free consulting). ×5–6 production speed, +50% quality, 1 person runs 3–4 machines.
Read the case study →
Romania's first mobile photovoltaic plant
An expandable container with 24 kW of panels and 52 kWh of storage that deploys 60 m of panels in 30 minutes. No building permit, no grid connection — it powers a 100% electric Grundodrill, financed through EU funds (PTJ Prahova).
Read the case study →
From 200 to 20,000 bricks a day with a complete Uzinex line
CAMMA was stuck with 2 Ukrainian presses and no working recipe. A complete turnkey line, a moisture calculator and the transfer of hyper-pressed semi-dry concrete chemistry know-how took it to 20,000 bricks a day. Romania's largest modular-brick producer.
Read the case study →5 laser machines for a NATO base where weather blocked conventional welding
A Romanian contractor with NATO accreditation delivered expeditionary aluminium hangars on a land military base, with a firm deadline and penalties. Wind and rain made TIG/MIG impossible. The solution: 5 identical lasers (3 active + 2 standby), run by people with no welding experience.
Read the case study →4 butt-welding machines for PE pipes up to Ø 630 mm
ARS Industrial closed its water-and-sewer crossings chain with a UZINEX package: HW630 + HW500 + WP100K electrofusion + the WPD20 recorder with ISO/DVS traceability. Their second contract after the mobile photovoltaic plant.
Read the case study →
A full-option print workshop for €61,000 · 2 people · 6 product categories
A family that returned from Italy after 9 years built a turnkey workshop (2×3 m UV flatbed, automatic cutter, engraving laser) with 200,000 lei from Start-Up Nation plus their own co-financing. The unexpected niche: custom UV-printed tiles. Orders start at 5 boxes.
Read the case study →
9 years · 0 service calls · a record on a 6 kW fiber laser
DORASERV SRL (the AIRONE Inox brand), a HoReCa market leader and white-label partner for Italian brands, built a complete stainless-steel factory on 7 UZINEX machines. The 6 kW fiber laser delivered in 2017 has run to this day without a single service call.
Read the case study →
How a 3-person workshop learned to weld in 2 hours
A premium photovoltaic installer with no welder on staff solved the skilled-labour shortage with a 3-in-1 laser welding machine. The owner learned to weld in 2 hours, with no prior experience. Welder salary avoided: €2,500/month.
Read the case study →