Uzinex, industrial machinery & equipment
Steel structure machinery

3-in-1 H-beam machine, assembly, welding, straightening LAZIRON PHJ

Product code: UZX-923

3-in-1 H-beam machine that assembles, submerged arc welds and straightens H, I and T beams of 4–15 m, with 1–2 operators. 60-month warranty.

Flange width
200–600 mm
Flange thickness
6–20 mm
Web height
200–1800 mm
Web thickness
6–16 mm
AI takes care
AI manual & maintenance
Transport & commissioning
Free across Romania
SEAP / SICAP
Eligible for public procurement
European funds
PNRR · POR · Just Transition
Industries served

Recommended applications

WELDED H-BEAMSWELDING GANTRYFLANGEWEBFILLET WELDUZX-SMREV.ASCALE 1:5DIN 919UNIT: mmUZINEX

Welded beam plants

STEEL FRAME BUILDINGCOLUMNRAFTERROOFINGROLLER DOORUZX-SMREV.ASCALE 1:5DIN 919UNIT: mmUZINEX

Steel buildings and halls

4-AXIS CNC FEEDINGPARTICLEBOARD STACKCNC NESTING 1CNC NESTING 2J1 · 360°PICK-UP50–150 kg · ARM 2200–3300 mm · RADIUS 2400–3500 mmXYUZX-233REV.ASCALE 1:5DIN 919UNIT: mmUZINEX

Series production

OVERHEAD CRANE IN A WORKSHOPGIRDERHOIST TROLLEYMACHINE TOOLUZX-PRREV.ASCALE 1:5DIN 919UNIT: mmUZINEX

Halls with overhead cranes

Technical data

Technical specifications

Flange width200–600 mm
Flange thickness6–20 mm
Web height200–1800 mm
Web thickness6–16 mm
Part length4–15 m
Submerged arc welding power sourceZhenzhong / Aotai
Welding speed300–1500 mm/min
Machine sizeapprox. 27 m
About this equipment

A 3-in-1 H-beam machine answers a question every producer of light steel structures asks: how do you make welded beams in series without a long line, three machines and a lot of crane handling? LAZIRON PHJ combines assembly, submerged arc welding and straightening on a single machine. It processes H, I and T beams with a web of 200–1800 mm, flanges of 200–600 mm and lengths of 4–15 m, and 1–2 operators are enough to run it.

In a classic plant, the beam goes through three stations: the assembly and tacking table, the welding machine, then the flange straightening machine. Between them, the part is lifted, turned over and moved several times. The PHJ replaces this route: centring during assembly and correction of distortion are done at the same time as welding, in a single pass. It sits right after strip cutting of the plate and before drilling and painting. See the full range of H-beam and box girder fabrication machines.

The 3-in-1 H-beam machine: advantages for steel construction

• Three functions, one machine: assembly, welding and straightening are done on the same machine. You no longer buy, maintain and find room in the hall for three separate machines.

• 1–2 operators for the whole process: the control panel is clear and can be used by a single person. Compared with a standard H-beam line, the number of people drops sharply.

• Symmetrical welding on both sides: submerged arc welding is done on both sides symmetrically, and hot correction and one-pass forming keep the beam straight from the start.

• 30% higher efficiency: compared with traditional equipment, fewer lifting and handling operations mean more beams per shift.

• Automatic, synchronous centring: clamping and centring of the flanges and the web are done synchronously, so the H-beam comes out symmetrical without manual adjustments from one part to the next.

• Stability during welding: the base components are castings, and the precision-machined rollers prevent vibration during welding. The technology is mature, with a low defect rate.

• Floor space saved in the hall: the whole machine is about 27 m long and takes up less space than a line with three separate stations.

• Low energy consumption: the integrated design eliminates transport between stations and idle running of several machines.

For a steel construction plant, these advantages add up to a single result: the cost per metre of welded beam drops, because you pay for less labour, fewer machines and less hall space.

What does not show on the data sheet matters too. The precision-machined rollers, the cast bed and synchronous centring mean the first beam in a series looks the same as the hundredth. For a shop that delivers structures for erection, this means connection holes that line up, columns that stand plumb and fewer complaints from the site team. A stable machine is also a machine that rarely breaks down, and the technology used in the PHJ is mature and proven in production.

Technical specifications: LAZIRON PHJ-0618 3-in-1 H-beam machine

ParameterValue
ModelLAZIRON PHJ-0618
Flange width200–600 mm
Flange thickness6–20 mm
Web height200–1800 mm
Web thickness6–16 mm
Part length4–15 m
Submerged arc welding power sourceZhenzhong / Aotai
Welding speed300–1500 mm/min
Machine sizeapprox. 27 m

Thicknesses of 6–20 mm for the flange and 6–16 mm for the web cover the typical welded beams for light structures, where a rolled section would be oversized or hard to find in the required length.

What actually changes in production

The first thing you notice is the traffic in the hall. On a classic line, every beam is lifted several times: from the assembly table to the welding machine, turned over for the second side, then taken to straightening. Every lift ties up the crane and needs two people for slinging. On the PHJ, the beam goes in as flanges and web and comes out finished, and the crane stays free for the rest of production.

The second thing is consistent quality. Welding distortion happens anyway, but on the integrated machine it is corrected hot, in the same pass, while the part is still clamped and centred. You no longer depend on an experienced straightener working by eye with a press and a torch. Beams from the same series come out identical, and erection on site goes ahead without adjustments.

The third thing is planning. With 1–2 operators on a single machine, daily capacity depends on the machine, not on how many people you managed to bring in for the shift. For plants facing a shortage of welders and skilled workers, this is often the deciding argument.

Applications: steel beams for steel halls and light structures

The PHJ is designed for the production and processing of light steel structures. The clearest example is steel halls for warehouses, logistics, agriculture and manufacturing: columns and rafters made from welded H-beams, with a tall web and relatively thin flanges, produced in series, at lengths of up to 15 m. For such projects, a beam welded to the exact size from the calculation saves steel compared with a rolled H-beam chosen from a catalogue.

The same machine also produces I-beams and T-beams, used for floors, industrial platforms, walkways and secondary structures. Steel construction shops that deliver complete hall kits gain control over lead times: steel beams are made in-house, to the dimension in the project, with no long-lead orders for sections and no offcuts from bars bought in standard lengths.

Demand for steel halls for logistics, storage, agriculture and light manufacturing keeps many structural shops busy. For them, the difference between buying a rolled H-beam and producing it in-house shows in the margin and in the delivery date promised to the customer. A shop that produces its own beams can quote faster, can accept last-minute design changes and no longer depends on the stock of rolled section distributors.

The machine is delivered with CE-certified components and with the documentation required by the Machinery Directive 2006/42/EC. If you produce beams larger or heavier than the PHJ covers, see the ZL assembly machine, which works in a separate flow with gantry welding and hydraulic straightening.

3-in-1 or classic H-beam line: when each one pays off

A classic line has three separate stations: assembly, gantry welding and straightening. It suits heavy beams, with thick flanges and large dimensions, where each stage needs a dedicated machine. But you pay for three machines, more floor space, more operators and a lot of handling between stations.

The integrated option pays off when you produce beams in series for light structures, in the range of 200–600 mm for the flange and 200–1800 mm for the web. Here, the advantage comes from the fact that the beam does not leave the machine until it is finished: assembled, welded on both sides and straightened. Fewer lifts also mean fewer accidental deformations and fewer risks for people.

From an investment point of view, the calculation is straightforward: one machine instead of three, one foundation and one power supply, one service contract. Equipment purchase cost, labour cost and factory floor space cost all drop at the same time, and payback comes from daily production, not from very large volumes that an average shop does not have.

If you are not sure which option suits your production, send us the beam sizes you make most often and your monthly volume. We will tell you honestly whether you need the integrated machine or a line with separate stations.

How the PHJ machine works

The flow starts from plate cut into strips for the flanges and web and ends with the finished beam, without the part changing workstation. The steps are as follows:

1. The flanges and the web, cut from plate to the width in the project, are placed on the machine.

2. The system clamps and centres the flanges and the web synchronously, with automatic positioning.

3. Submerged arc welding is carried out symmetrically on both sides, at a welding speed of 300–1500 mm/min.

4. In the same pass, the machine hot-corrects the flange distortion caused by welding.

5. The H, I or T beam comes out formed in a single pass, ready for drilling, cutting to length and painting.

The whole cycle is run from a single panel, by one operator, with the help of a second person for loading and unloading. On a 3-in-1 H-beam machine, the program changes quickly from one size to another, so small series of different beams also stay profitable.

Operator training is included at commissioning and is given by our local team, in your language, directly on the beams from your production. The operator learns the settings for each size, the welding parameters and how to check the finished beam, so the machine produces from day one.

What Uzinex provides

• Delivery, installation and commissioning, with operator training on your own parts.

• 60-month warranty and service with on-site response in under 24 hours in Romania (24–72 hours in other countries).

• Technical documentation for EU-funded, PNRR and public procurement projects.

01 / Case studies

Remarkable success stories.

Products and services that have earned the appreciation and trust of clients across industry.

FUTURE ENERGY GROUP

A photovoltaic workshop that learned to weld in 2 hours

with a 3-in-1 laser machine (welding + cleaning + cutting) and a smart capital decision

Read more→
01 / 05
Compliance

Certified, eligible,
sustainable.

All delivered equipment meets European quality standards and the DNSH principle, is eligible for acquisitions through EU and PNRR funding, and includes interactive AI-powered manuals for operation, maintenance and operator training.

ISO 9001
ISO 14001
CE Marking
EN 1090
DNSH
PNRR
EBRD
AI Manuals
Key components from
SiemensMitsubishi ElectricSchneider ElectricABBSamsungPanasonicOmronYaskawaWEGFanucBosch RexrothFestoSMCRockwell AutomationAllen-BradleyDanfossSEW-EurodriveSiemensMitsubishi ElectricSchneider ElectricABBSamsungPanasonicOmronYaskawaWEGFanucBosch RexrothFestoSMCRockwell AutomationAllen-BradleyDanfossSEW-Eurodrive
02 / Video gallery

Uzinex on TV,
at fairs and in the field.

Media appearances, technical demos and presentations from the most important industrial trade fairs in Europe. See our technology in action.

03 / References

Their words,
not ours.

12 quotes from 6 video interviews

Over 100 companies in manufacturing, logistics and industry have chosen Uzinex as their strategic partner.

All references→
Companies that chose Uzinex
Modular Brick Romania
Iron
Future Energy Group
Geomar Metal Work
MDG Gold Paper
Geo-Ex Construct
Modular Brick Romania
Iron
Future Energy Group
Geomar Metal Work
MDG Gold Paper
Geo-Ex Construct
Video interview
„We do stainless-steel metal fabrication dedicated to restaurant kitchens. The UZINEX equipment was a radical change: modernization, an increase in production and quality.”
Octav Damasken
Director · DORASERV SRL, AIRONE Inox
Case study→
Video interview
„I had no idea, I was completely clueless. And you started to explain to me. You told me what technologies to choose, what packaging to produce, what would work better on the market.”
Robert
Founder · MDG Goldpaper
Case study→
Video interview
„We use a single person who can operate 3-4 machines. Before, we needed 3-4 people to do the same thing.”
Jan Paul Elhor
Founder · Fier-Forjat Limanu
Case study→
Video interview
„We have multiple challenges in making special structures that serve our systems, and the laser welding machine solution helped us enormously.”
George
Future Energy Group · Bucharest
Case study→
05 / Industry 4.0

Integrated solutions
for the factory of the future.

Six technology directions we integrate turnkey: from plug & play IIoT sensors, to cobots, predictive maintenance, optical inspection, MES connectivity and custom industrial software.

01
Industry

Plug & Play IIoT & Monitoring

See in real time how much each machine produces and how long it sits idle. We fit sensors on any equipment, new or old, and within a few hours you have the OEE dashboard on your phone. No complex wiring, no production downtime. The first concrete step toward digitalization, with ROI visible from the very first month.

  • OEE dashboard on your phone from day one
  • Fits any machine, with no production downtime
  • Investment recovered in 3-6 months
Recommended package
UZX-IIoT
View details →
02
Industry

Collaborative robotics

Solve your labor shortage without tripling your costs. The cobot works safely alongside your people (palletizing, feeding the CNC, welding) while you recover the investment in 12-18 months. Prices 30-40% below European distributors, with installation and programming included from us.

  • ROI in 12-18 months, with no extra staff
  • Installation + programming included in the package
  • 30-40% below European distributor prices
Recommended package
UZX-Cobots
View details →
03
Industry

Predictive maintenance

Stop waiting for things to break. Our algorithms analyze sensor data and tell you exactly which part will fail and when, and we bring it to your production line before the breakdown. Zero unplanned downtime, zero contractual penalties, complete operational peace of mind.

  • Zero unplanned production downtime
  • The spare part arrives before the breakdown
  • Essential for public contracts and the defense sector
Recommended package
UZX-Predictive
View details →
04
Industry

Optical inspection

Eliminate defects before they reach the customer. Our cameras inspect every part at speeds no operator can match, detecting sub-millimeter defects. They mount onto your existing line, with no modifications. Ideal if you produce for export and have strict quality clauses.

  • Detection of defects under 1mm, in real time
  • Mounts onto your existing line, with no modifications
  • 90%+ fewer rejects at export customers
Recommended package
UZX-Vision
View details →
05
Industry

Edge Computing & MES Connectivity

Connect your machines to your office, regardless of brand or age. Our gateway automatically translates the data from any machine into your ERP's format: no manual entry, no paper forms, no human error. The manager sees production live, the operator receives digital instructions.

  • Compatible with any machine brand
  • Live production data in ERP/MES, paper-free
  • Implementation time: under 2 weeks
Recommended package
UZX-Edge
View details →
06
Industry

Custom industrial software

Have a process that no off-the-shelf software can solve? We build custom industrial applications: from tailored SCADA panels and HMI interfaces, to production planning systems, lot traceability and automated reporting. The code is yours, it runs on your servers, with no monthly subscriptions or vendor lock-in.

  • Custom SCADA, HMI and control panels
  • Full lot-by-lot traceability for audits
  • Proprietary code, no recurring licenses
Recommended package
UZX-Software
View details →
06 / Global presence

Uzinex, a global groupWe connect industrial operations across Europe, Asia, the Middle East and North America.

IAȘIRomania · HQ
UZX · GLOBAL NETWORK5 NODES · ONLINE
HQ · CENTRAL
Romania
Iași
Company
Uzinex HQ
Contact
Sorin Baciu
Email
sorin.baciu@uzinex.ro
Phone
+40 769 081 081
All locations
08 / FAQ

Frequently
asked questions.

Answers to the most common technical and commercial questions. Can't find what you're looking for?

Contact the team →
The price is set in the quotation, based on the model and configuration. What matters most: flange width 200–600 mm, flange thickness 6–20 mm, web height 200–1800 mm.
09 / Contact

Let's build your
next project together.

Contact our team and receive a personalized offer within a maximum of 24 working hours.

Phone
+40 769 081 081
Email
info@uzinex.ro
Headquarters
Tehnopolis Science & Technology Park
10 Poitiers Blvd, 700671 Iași, Romania
Talk to an engineer→