Stainless steel fabrication for HoReCa: you sell a surface, not a part.

A guide to work tables, sinks, hoods and professional kitchen fit-outs. Why the stainless you deliver appears to rust and how you prevent it, the four finish levels and why they are quoted separately, plus the four hygiene rules that change the drawing, not the fabrication.

5
Cauze de contaminare
toate previn petele de pe inox
4
Finish levels
quoted separately, not included
4
Hygiene rules
change the drawing, not the fabrication
60 mo
Machine warranty
Uzinex standard, not an option
What we supply and what we do not, said up front

Of the flow of a stainless workshop, we equip from the catalogue the part covering part forming: laser cutting, bending, rolling and shearing. The equipment for TIG welding, grinding, brushing and passivation is not part of the standard catalogue and is sourced separately. We mention it explicitly because with stainless it is precisely those operations that decide whether the job is accepted.

· The premise

The customer is not buying a part.
They buy a surface that passes the inspection.

In HoReCa a stainless table is judged on three criteria an ordinary fabrication workshop does not account for: it can be cleaned completely, it looks uniform next to the adjoining parts, and it does not stain after a month. All three are decided before welding.

The margin is on finish and on shape

Everyone buys sheet at similar prices. The difference is made by curved parts, which require rolling, and by the finish level, which is pure labour on the same material. A workshop delivering only flat, mill-finish parts competes on price alone.

Demand comes in waves of fit-outs

Every restaurant that opens, every kitchen that is refurbished is a complete order, with a deadline tied to the opening date. Whoever delivers on time becomes the fit-out company's default supplier, and that company comes back with the next project.

The product is not imported

Tables and sinks are made to the real kitchen dimensions, are hard to transport and are installed on site. The market is local and protected by logistics, exactly as with stone countertops or made-to-order furniture.

The complaint arrives late

Contamination spots appear two or three weeks after delivery, when you can no longer prove anything. That is why the discipline of separating stainless is not an organisational preference, it is the insurance policy of the business.

· The number one cause of complaints

Stainless does not rust.
It is the iron left on it that rusts.

Five causes, all of them contamination, all avoidable with measures that cost almost nothing: a separate rack, a dedicated tool set, its own workbench, distance from steel cutting, and final passivation.

The practical problem is that the effect appears late, at the customer's site, when the conversation is no longer technical but commercial. That is why prevention is the only strategy that works.

WHY “STAINLESS RUSTS” · FIVE CAUSES, ALL CONTAMINATION304 STAINLESS1Shared storagestainless next to carbon steel, on the same racka separate, marked rack2Shared toolsbrushes, discs and clamps also used on steela set used only on stainless3Shared workbenchiron particles left on the workbencha physically separate stainless area4Sparks from cuttingparticles thrown off nearby steel partsdistance or a screen5No final passivationthe passive layer is not restored after processingpickling and passivationStainless does not rust. The iron particles left on it rust, and the customer sees a stain and sees your fault.The spots normally appear two or three weeks after delivery, which is exactly when you can no longer prove anything.
· Entry levels

Three configurations,
three types of accessible work.

The most important difference between the levels is rolling: without it you stay on flat parts, that is on the lowest-margin side of any fit-out.

LEVEL 1
Tables and shelving workshop

A small workshop supplying local restaurants and canteens, with standardisable products.

order of magnitude EUR 80,000 to 160,000
What you produce
work tables, shelving, simple cabinets, trolleys
Staff
3 to 4 people, one of them a TIG welder
Space
300 to 500 m², with the stainless area separated
Where it gets stuck
  • Without rolling you cannot make hoods, curved elements and ducting, that is the highest-margin work.
  • The finish stays entirely manual, so polishing time limits how much you can deliver per week.
  • A single TIG welder is a single point of failure: their holiday stops deliveries, however well you cut.
LEVEL 2
Complete stainless workshop

A manufacturer delivering complete professional kitchen fit-outs, through fit-out companies or directly.

order of magnitude EUR 220,000 to 450,000
What you produce
hoods, sinks, tables with basins, shelving, curved elements
Staff
5 to 8 people, with two welders and a finisher
Space
500 to 1,000 m², with a separate clean finishing area
Where it gets stuck
  • The finish becomes the bottleneck: a finely brushed part consumes several times more time than a mill-finish one.
  • You need a clean finishing area. A perfectly polished part is ruined in a zone with metal dust.
  • The aesthetic requirements of fit-outs are strict: brush direction and uniformity between panels are checked at handover.
LEVEL 3
Production for the food industry

A manufacturer delivering equipment that comes into direct contact with the food product.

order of magnitude EUR 500,000 and above
What you produce
vats, tanks, conveyors, process equipment
Staff
over 8 people, with welders qualified on procedures
Space
over 1,000 m², with surface inspection and passivation
Where it gets stuck
  • Surface and traceability requirements rise significantly. Documentation becomes part of the product.
  • Welding requires qualified procedures, and the bead is inspected. It is no longer a matter of appearance, it is one of conformity.
  • Passivation and surface inspection become mandatory operations, with dedicated equipment and chemicals.
· Stage by stage

What happens, precisely
from sheet to accepted part.

Stainless is stored on its own marked rack, with no contact with carbon steel. A single day on the same rack is enough for iron particles to adhere to the surface.

The protective film is kept on for as long as possible through the flow and removed only before finishing. Handling scratches cannot be repaired on a finely brushed surface.

The rolling direction of the sheet is recorded too. On adjoining brushed parts the brush direction has to be the same, and that is tied to how you nested the parts in the sheet.

· Where the margin is

The finish is labour,
so it is quoted separately.

The same sheet, four different products. The difference is not the material, it is the number of polishing passes, each consuming real time per square metre. Brushed is the HoReCa standard; mirror appears only decoratively and has the drawback of showing every scratch.

And the detail most often missed: the brush direction has to be the same across all adjoining parts. A panel brushed the other way is seen at first glance and is grounds for rejection.

SURFACE FINISH · POLISHING PASSES AND USEMILL, 2BPASSEShidden spaces, internal structu…the sheet arrives like this from th…BRUSHED 180PASSESprofessional kitchen furniturethe most requested in HoReCaBRUSHED 240PASSESvisible fronts, serving areasuniform appearance, brush directionMIRRORPASSESdecorative elements, bar, displ…shows every scratchThe finish is quoted separately, because every pass is real labour per square metre.The brush direction has to be the same across all adjoining parts. A panel brushed the other way is spotted immediately.The names and the number of passes are indicative; they are confirmed against the sample approved by the customer.
· Hygiene

Hygiene changes the drawing,
not just the cleaning.

Four rules settled at the drawing stage that cannot be corrected during fabrication: internal radii instead of sharp corners, a continuous ground weld, a surface with no gaps, folded or deburred edges.

An ordinary metal fabrication workshop does not think in these terms, which is why many technically correct parts are rejected at handover in a professional kitchen.

HYGIENE CHANGES THE DRAWING · NOT JUST THE CLEANINGREJECTEDCORRECTSharp internal cornerGenerous internal radiusa sharp corner cannot be cleaned and collects residuePorous weld beadContinuous weld, ground, polishedporosity holds bacteria and fails inspectionGaps and overlapsContinuous surface, no gapsany gap is a place detergent cannot reachExposed cutting edgeFolded or deburred edgea cut hazard for staff, rejected at handoverIn HoReCa you are not selling a stainless part. You are selling a surface that has to pass a hygiene inspection.
· Who you sell to

Four categories,
with steadily rising demands.

Restaurants and hotels

Directly or through fit-out companies. Work tables, sinks, hoods, shelving. Medium aesthetic requirements, deadlines tied to the opening.

recurring, fixed deadlines

Catering and canteens

Volume equipment, standardisable, focused on robustness and ease of cleaning rather than appearance.

volume, standard product

Confectionery and pastry

Strict hygiene requirements and surfaces with no gaps. Smaller parts, but more demanding to fabricate.

strict hygiene

Small food industry

Vats, tanks, conveyors. Direct contact with the product, therefore welding procedures and documentation.

large ticket, conformity
· What the brochures leave out

Ten mistakes,
and the first three only show at the customer's site.

The peculiarity of stainless: the mistake is not visible when the part leaves the workshop. It shows up weeks later, on a surface where you can no longer prove where the contamination came from.

01

You store the stainless next to carbon steel, and the spots appear at the customer's site, three weeks after delivery.

02

You use the same brushes and discs on stainless and on steel, contaminating every part you touch.

03

You skip passivation, so you neither restore the passive layer nor remove the iron particles.

04

You fold the finish into a single price per square metre, then lose on every job with aesthetic requirements.

05

You brush adjoining panels in different directions, and the job is rejected for a purely aesthetic reason.

06

You cut with oxygen to save on gas, then dress every oxidised edge by hand.

07

You weld continuously on thin sheet, in the wrong sequence, and the top comes out wavy and cannot be straightened.

08

You draw sharp internal corners, and the part fails the hygiene inspection.

09

You finish in the same area where carbon steel is worked, contaminating the part right at the end.

10

You have no second TIG welder, so one person's holiday stops all deliveries.

· Implementation plan

From the decision to the first fit-out delivered,
in 90 days.

DAY 1 to 15

The segment and the standard products

  • You choose the segment: HoReCa fit-outs, catering, confectionery or food industry.
  • You settle on two or three standard products you will repeat: table, sink, shelf.
  • You check who does fit-outs in your area and how they buy: directly or through fit-out companies.
DAY 16 to 35

Configuring the part forming

  • You receive the cutting, bending and rolling configuration for your thicknesses and formats.
  • We settle what is sourced separately: TIG welding, grinding, brushing, passivation.
  • You finalise the building layout with the stainless area and the finishing area physically separated.
DAY 36 to 55

Financing and suppliers

  • You submit the leasing or credit file for the forming machines, with a down payment from 0%.
  • You conclude the supply agreements for stainless sheet, on running finishes and grades.
  • You purchase the welding and finishing equipment, separately from the main machines.
DAY 56 to 75

Preparing the building

  • A rack dedicated to stainless, a marked tool set, a clean finishing area, fume extraction at the welding bay.
  • Dry compressed air, nitrogen for cutting, extraction at the laser.
  • Recruiting and training the TIG welders and the finisher.
DAY 76 to 90

The first job delivered

  • Commissioning, cutting settings for stainless, the first part measured and corrected.
  • A complete trial product, finished to the required level and passivated.
  • The first fit-out delivered, with a signed handover and the finish sample approved in advance.
· Financing

The forming machines
are financed through leasing.

Cutting, bending and rolling go into a straightforward application, with a down payment from 0% and the first instalment after delivery. The welding and finishing equipment, being outside our catalogue, is covered separately, but it is a far smaller amount than the main machines.

· Frequently asked questions

About fabrication
in stainless steel for HoReCa.

You get the machine configuration for cutting, bending, rolling and shearing, that is the part-forming side. TIG welding, grinding, brushing and passivation are operations whose equipment is not part of our standard catalogue and which we state explicitly as being sourced separately. You bring the building, the welders and the customers.

Tell us what work you are targeting
and what finish your customers ask for.

The type of fit-outs, the stainless thicknesses and the finish level required. You receive the cutting, bending and rolling configuration, the recommended nitrogen cutting settings, the plan for separating the stainless area, and the list of welding and finishing equipment sourced separately.

09 / Contact

Let's build your
next project together.

Contact our team and receive a personalized offer within a maximum of 24 working hours.

Phone
+40 769 081 081
Email
info@uzinex.ro
Headquarters
Tehnopolis Science & Technology Park
10 Poitiers Blvd, 700671 Iași, Romania
Talk to an engineer